North Devon

Projects / Works / Schemes Lead Authority Study, Design or Works 2018/19 DCC Contribution
£
2018/19 DCC Flood Prevention
£
Details of Proposal
Bishops Tawton EA W 20,000 Further contribution from DCC to EA towards detailed hydraulic model and optioneering of flood improvements to reduce risk from the main rivers and surface water
Barnstaple DCC S 30,000 Continuation of surface water management study, commenced in 2017/18. Potential to contribute towards EA main river FDS
Ilfracombe DCC S/D 30,000 Review of SWMP and consider flood improvement options

Recent and Current Work

The following case study has been prepared to highlight some of the excellent work that has been achieved, is being developed, and the different opportunities that have been adopted for funding the schemes.